Wednesday, September 9, 2009

Wed 9th Sep 2009

Finally some pics of our fully liveable ger!


Bernt working on the floor joists.


Stacey putting a finish on the floor (green tongue boards).


The structure of the ger in its permanent home. We had to construct it around the bed because it wouldnt have fit through the door.


Bernt working on the bathroom, we poured a concrete slab with a drain for the shower.


The ger set up with the attached bathroom taking shape. The exterior cladding of the bathroom is made of poles; by-products of the veneering process which a guy was selling for firewood.


The bathroom as seen from inside the ger, before the interior lining has been put in. The poles were so beautiful, pity we couldnt leave it like this.


The finished bathroom, fully lined and water tight. Complete with self contained composting toilet and hot shower. Very comfortable.


The fully set up ger. With the great firewood shelter Bernt constructed from colourbond left over from the watertank construction.


INTERIOR OF THE GER, CLOCKWISE FROM THE FRONT DOOR


Our little office nook. Computer doubles as TV.


Our bed, with all of my restored and handpainted tip shop finds, as well as a really handy set of bookshelves we built from left over flooring material.


The laundry/ kitchen sink/ bathroom basin and the door to the bathroom.


A guest bed we set up for mums visit, our plan was to bring it in or take it our depending whether we had visitors... havent got around to taking it down yet.


The lounge room/ Charlies prefered sleeping spot... with the little wood stove in the foreground which heats up the ger really nicely and which we cook dinner on.


The kitchen, with another tip shop find which I restored and painted then attached to an old book shelf to make a kitchenette.

Tuesday 18th Aug 2009

We are finally heading skywards!!!!!

Finally our build site has started to head into the 3rd dimension, we have been working hard laying blocks for a few weeks now and are really excited to see walls emerging! Just finished off the 6th course (200mm high concrete blocks so… 1.2m high). Tomorrow we start filling the blocks with concrete, having decided that doing it in stages will be much easier than hauling hundreds of concrete filled buckets 2.5m in the air. We are nearly at the point where we have to start thinking about scaffolding… that sounds like serious building to me! So it feels like it is all happening for real now.  The bank gave us a nine month deadline (with the possibility of a little flexibility but we did sign a contract so it would rely on their good nature if we went over… ) which is now 7 months away so I am feeling the time pressure. Mainly because we have no schedule or time line of any sort whatsoever and absolutely no concept of how long things will actually take us to do. The blessing is that the house only needs to be to ‘certificate of occupancy’ stage by then which means safe and liveable, not 100% finished.

 

Bernt, Stacey and Charlie hard at work on the front wall.

Bernt has had the last 6 weeks off work, first week with a nasty flu and then he decided to take time off to get a head start on the build. That time has just ended but he has decided to take a bit more off as we’ve had to fit so many things into the last month that building work has progressed rather slowly.

First he worked super hard to get the bathroom built and ready the ger (our Mongolian tent adventure) for us to move in. We started out camping in it with just our bed and a couch; progressed to having a basic kitchen, then water, then a bathroom complete with toilet and finally a fully functioning hot water system. It really is the most glorious thing ever!! I’ve included a gallery of pics. Recently mum came for a few days and we even fitted a double bed in for her. It has so far survived 24 hours of non stop rainfall, below 0 degree nights, gale force winds and our 50 kilo puppy without any dramas.


 Bernt's super fantastic and very civilised bathroom.

So in moving into the ger we also had to move out of the blue house. We tried to do it gradually but the moving process seems determined to be difficult and stressful no matter what! It took up a lot of time and the pets seemed pretty confused by all of the to-ing and fro-ing. They always seemed more willing to jump in the car when we were heading back to the ger, they love it here. We had to really cull our stuff down to the bare minimum to fit in the ger which means that our container is looking pretty full again. But Bernt has built a great storage system in there so it wont be hard to get organised.

Then we got stuck in to laying blocks just in time for a long planned for couple of days in Melbourne for mum and I. We had a ball roaming the streets (Note; don’t decided to wear in a new pair of shoes when on holidays… dumb me!), rummaging through shops and sampling lots of yummy food (Highlight; Hwaro Korean BBQ on Little Bourke Street, don’t be scared to ask lots of questions…). As before mentioned mum also took a detour and spent 2 days with us here in Tas, to check out progress, our new living arrangements and our growing furry family.

But back home now and we are going hard on the build… weather permitting. So excited that things are moving forward at a more realistic pace now!

One rather stressful event occurred in late June when my computer died. It was a nasty slap of reality as we had been too complacent to make back ups of any of my files…. Including all of the drawings for the build, some of which (kitchen design) I hadn’t even printed off yet…. STUPID!!! Anyway, after a month of waiting for the computer fixer guy (unworthy of a more respectful title) he actually managed to save all my files and burn them to disk. Now we just need to work out how to use AutoCAD on our new Mac…

My dream basin has not yet arrived but I found a very super spectacular one in Melbourne last week if it falls through. Apparently mine has been sitting in Launceston for the last 6 weeks… Lucky I ordered it waaaay in advance.

Hope to blog much more frequently now the build is going forward more quickly.

Monday 8th June 2009

Talk about few and far between; this blog is turning into a quarterly update!. Things have been slowed significantly due to a few factors. Bernt’s 3 weeks in Holland have meant that we had to wait for 3 decent looking payslips after he got home to take to the bank to beg for more money. So that meant waiting a month after he was home and since then we have been playing one sided paperwork tennis with the banks. It’s been 2 and a half months and we’ve just managed to sign the final documents for our loan. Still have a couple of weeks to wait till things are finalised… mmmm, don’t get me started…

Bank issues aside we have been having other progress on the block. As well as our exciting side adventure which I will cover in detail in a few paragraphs J. After over a year of dealing with the local electricity supply company we finally got a power pole put in on our boundary! Yay! That was a pretty exciting day, full of trucks and fluoro vests! I watched on with worry as they decided it was easier to drag the power pole up the driveway than trying to haul it on its trailer. Surprisingly to me (not to them, they were very confidant about the whole thing) it didn’t damage the driveway even slightly.

Then, not long after the excruciating 3 weeks of Bernt being away (with a traumatised dog who kept running outside to check if ‘daddy’ was coming home or insisting on checking out the bed to see if ‘daddy’ was just having a really long sleep in) we decided to add to the family and brought home George the cat. He and Charlie were playing and sleeping together almost immediately, though George wasn’t real keen about the ‘head in Charlie’s mouth’ game… which not surprisingly turned out to be one of Charlie’s favourite new games.


Charlie asleep in a very flattering position while George sleeps on his bed. 

Bernt and I plodded along on the block, tidying up and taking off the boxing (the framework for the slab pour). Waterproofing the sides of the slab and infilling nearly up to slab height with drainage rock, things that made it look much neater for the valuer. Also laying pipe to eventually connect the drain pipes to the watertank (we learnt our lesson and had a guy come with a little excavator to dig for us).

Over Easter we decided to build a concrete ramp so we could drive up into the workshop space. We built the boxing with a cool curve in it to follow the line of the driveway. Building it took a solid 5 hours of mixing and pouring concrete in our little mixer. It was utterly exhausting but we were very happy with the finished product. Because we had chosen to sleep in a little that day Bernt ended up at the block in the dark until nearly midnight waiting for it reach that right balance between set enough but not set too much in order to smooth it to a nice finish. Luckily it dried slow enough that we could put the final touches on it the next morning. Also lucky that ramps should have a fairly rough finish… because that’s as far as our concreting skills allowed us to get… Thank god we didn’t try and finish off the slab ourselves. None the less, it is a very pretty ramp and I still insist on rave reviews from every person who has the pleasure of driving on it J


Before ramp

Finished Ramp

We also got around to finding an electrician to hook us up to electricity by installing a metre box with power point. The most super satisfying feeling to boil the kettle and have our first cup of tea on the block!! Can’t believe we’ve been here for a year with no power, or rather with only a noisy and annoying generator to get the job done. Hallelujah for electricity!!

Boiling the kettle for our first cuppa (on top of our new meter box)

I received my Kevin money, fairly early judging from facebook feedback. Thanks Kev! And with that little windfall I bought my dream basin! Well ordered it anyway, it’ll take over a month to get here. Its an Aussie company so that means I’m doing my bit doesn’t it?

So, now… let’s get back to the exciting side adventure that Bernt and I are embarking on!! About 3 weeks ago we went along to the Sustainable Building expo in Hobart, thinking we would come across some cool innovative technology… What we ended up coming across was a beautiful ger (pronounced like ‘there’). A ger is a tent which Mongolian nomadic herdsmen (apparently 30% of the Mongolian population) live in, it is otherwise known as a yurt but apparently ger is the more PC term. It was standing, fairly conspicuously, amongst solar hot water and sustainable septic system stands. We decided to go in and have a look…. and…. absolutely fell in love. It is a 6.5 metre diameter circular tent with beautifully hand painted roof poles and a sort of latticework wall structure. In the centre of the roof is a wooden circle held up by 2 posts covered by a flap which is either open or closed depending on the weather. The walls and roof are made of layers of cotton (inside and out for aesthetics), thick thick felt (which keeps the Mongolians warm at minus 40 Celsius) and canvas (which makes it water proof). It had the cosiest, womb kind of feeling inside and I didn’t want to leave. That was when we saw the ‘For Sale, 60% off’ sign…. Oh no…. Bernt and I looked at each other and all kinds of craziness ensued. 

Saatia, who’s business it represented, told us that she was in Hobart till Monday at which point she would be driving the (our) ger back to Melbourne. It was understood that we would need some instruction on how to assemble it so if we wanted it the most logical and economical thing would be for us to decide tute sweet and for her to bring it to our block and set it up for us before she drove off into the sunset on Monday. An evening of negotiations followed between Bernt and I… An intense evening full of lists, shortness of breath and near heart attacks (the latter obviously being only experienced by me… not cool hand BerntJ) We decided no, a fairly definite no at one point in the evening but then I started breathing again, picked myself up out of the foetal position and we decided, what the hell, you only live once, lets do it!!! Oh My God!!! 

So we dove in, and by Monday afternoon we had our very own little piece of Mongolia sitting in its temporary position on our slab. We are now in the process of organising all of the minute (haha) details of how we can actually functionally live in the thing! CRAZY! We wont be moving out of our rental until it has a decent bathroom (I’ve ordered a very respectable self contained composting toilet) and we have worked through all of the other logistical issues. But I’m very very excited and have been playing around with super essential things like fairly lights J I hope you all want to come and visit when it is set up! Ill post photos of the interior when its liveable to alleviate any concerns! OH MY GOD! What a crazy adventure!

Friday 15th May 2009

Our crazy new side adventure; to live in a mongolian tent for a while.


The bones of the ger being set up on the slab (temporarily).


Bernt putting up a pole.


The set up team in front of the finished product.


I couldnt resist these beautiful orange lanterns. Pretty!