Wednesday, September 23, 2009

Blockwork finished!... For now...

It took us just over 2 months but we have done it! We are finished laying blocks for now; poured our last bucket of concrete yesterday to fill our exterior walls. Yay! We have been remembering the day that Bernt put up the first hurdle (to run string lines off for the block walls). It was 3 metres high and we both looked up with mouths gaping, looked at each other and wondered what we had signed ourselves up for! And that wasn’t even the full height of the walls! We decided that we would do what we could, and if we got to a point where we couldn’t handle it then we would pay someone to finish it off… Well, we did it! 

We have, to this point, laid around 2000 concrete blocks and now intimately know the difference between lintel blocks and knock out blocks, as well as having developed favourites. Bernt; the 200mm wide blocks because they are the easiest to level, Stacey; the 150mm wide blocks because they had a smaller surface to mortar. We took on roles; Bernt commandeered the concrete mixer, mixing mortar and getting a real feel for achieving just the right consistency. I was in charge of mortaring, getting very handy with the trowel (and giving my wrists a hell of a work out) and Bernt placed and levelled the blocks. It was hard to decide which was more enjoyable; watching the walls get higher or watching the pallets of blocks disappear.

The exciting courses to lay were the ones which stared to show where windows were going to be, and then most exciting were the courses which finished off the windows, lintel blocks running over the top of temporary framework which we then filled with steel reinforcing and concrete. It was so strange to see the long back wall emerging looking very much like a drawing we once drew… seems like years ago now!

 

Bernt and Charlie inspecting the workshop windows.


The finished bedroom window.


 

The back wall with windows all taking shape. Charlie will be very disappointed when we put glass in his favourite look out (aka the bathroom window).

Then we got to finish height of our interior walls (on top of which will sit the mezzanine floor) and filled those walls with concrete. It felt super good to have them finished and solid. We had a bit of a scare just a week or so earlier when, on a very stormy day, we had a big tree come down with the top of its branches landing about 3 metres from the build. We were very lucky; the neighbour lost around 20 huge trees, looked like a cyclone tore through and around the corner a massive tree fell on a house, completely crushing half of it. Luckily it was a holiday home so no one was in it. Our little ger survived unscathed and we thanked our lucky stars!


The interior walls in the apartment after being filled with concrete.

As we started to get higher and higher, we worked on top of a little trolley for a while, adding blocks to stand on to get ourselves up higher until it got to a not so safe looking pyramid. That’s when we invested in scaffolding. We considered renting it but found a really good deal from the mainland and when we weighed up how long we’d need it for and the gaps between each job we decided to buy it. It arrived within a week or so of ordering and it has been great! The deal was for two 3.5 metre high platforms and a free mini fold up scaffold. We can put the two towers on top of each other to get to the apex of the roof (7metres) and we bought extra bracing to make that a safe option.


Bernt standing on our dodgy, pre scaffolding arrangement.

 


Stacey on one of our new scaffolding towers. Much safer!

We have had quite a few days of nasty weather, either too wet to mortar or too windy to trust the string line. On one of those days we headed into Hobart to talk to a lighting designer. Still waiting to hear back from her with a definitive plan but we have a much better idea of what’s happening now.

We also spent a day visiting all of the local timber mills to work out where to get the timber for our traditional green timber frame. Apparently there is a bit of a shortage in Celery Top Pine, because it’s been the wettest winter in years so the trucks cant get to the forests. So one company had a bit of a monopoly on the logs. After much conversation and negotiation Bernt has decided to jump in headfirst and cut the timber himself. He bought a Lucas Mill (which arrived yesterday).  It is a portable saw mill, basically a circular saw which runs the length of a log on tracks and which you can adjust to cut both horizontally and vertically. It was a huge investment but if all goes well it should pay itself off in this one job and then it will be invaluable when we start making furniture. The price of buying logs is $140 per cubic metre compared to buying cut timber at $1800 per cube. Obviously the waste needs to taken into consideration but it is still potentially a saving, plus we get to keep all of the off cuts and can potentially use them for things down the track like building our veranda.

So the Lucas Mill arrived yesterday just an hour or so before we poured our last bucket of concrete into our finished walls. The first truck of logs is due to be delivered on Thursday so it all happened in good time. We haven’t actually finished laying every block, we still have about 5 pallets left (about 700 blocks) but those can’t be laid until the frame is in place. And it sure will be nice to have a break from concrete, I’m happy to exchange sawdust for concrete dust any day!


The long back wall before reinforcing steel is put in and then filled with concrete.



Blockwork complete! For now…

 


What a HUGE workshop!

 


The Lucas Mill arriving.

 


Bernt opening the Lucas Mill.

Wednesday, September 9, 2009

Wed 9th Sep 2009

Wall Construction.


20 pallets of concrete blocks delivered to site.


Stacey laying the first block.


The first course of blocks.


Stacey mortaring (we like to call it buttering).


Bernt laying a block.


Finished the 6th course (window sill height), about to start filling the blocks with concrete.

Wed 9th Sep 2009

Finally some pics of our fully liveable ger!


Bernt working on the floor joists.


Stacey putting a finish on the floor (green tongue boards).


The structure of the ger in its permanent home. We had to construct it around the bed because it wouldnt have fit through the door.


Bernt working on the bathroom, we poured a concrete slab with a drain for the shower.


The ger set up with the attached bathroom taking shape. The exterior cladding of the bathroom is made of poles; by-products of the veneering process which a guy was selling for firewood.


The bathroom as seen from inside the ger, before the interior lining has been put in. The poles were so beautiful, pity we couldnt leave it like this.


The finished bathroom, fully lined and water tight. Complete with self contained composting toilet and hot shower. Very comfortable.


The fully set up ger. With the great firewood shelter Bernt constructed from colourbond left over from the watertank construction.


INTERIOR OF THE GER, CLOCKWISE FROM THE FRONT DOOR


Our little office nook. Computer doubles as TV.


Our bed, with all of my restored and handpainted tip shop finds, as well as a really handy set of bookshelves we built from left over flooring material.


The laundry/ kitchen sink/ bathroom basin and the door to the bathroom.


A guest bed we set up for mums visit, our plan was to bring it in or take it our depending whether we had visitors... havent got around to taking it down yet.


The lounge room/ Charlies prefered sleeping spot... with the little wood stove in the foreground which heats up the ger really nicely and which we cook dinner on.


The kitchen, with another tip shop find which I restored and painted then attached to an old book shelf to make a kitchenette.

Tuesday 18th Aug 2009

We are finally heading skywards!!!!!

Finally our build site has started to head into the 3rd dimension, we have been working hard laying blocks for a few weeks now and are really excited to see walls emerging! Just finished off the 6th course (200mm high concrete blocks so… 1.2m high). Tomorrow we start filling the blocks with concrete, having decided that doing it in stages will be much easier than hauling hundreds of concrete filled buckets 2.5m in the air. We are nearly at the point where we have to start thinking about scaffolding… that sounds like serious building to me! So it feels like it is all happening for real now.  The bank gave us a nine month deadline (with the possibility of a little flexibility but we did sign a contract so it would rely on their good nature if we went over… ) which is now 7 months away so I am feeling the time pressure. Mainly because we have no schedule or time line of any sort whatsoever and absolutely no concept of how long things will actually take us to do. The blessing is that the house only needs to be to ‘certificate of occupancy’ stage by then which means safe and liveable, not 100% finished.

 

Bernt, Stacey and Charlie hard at work on the front wall.

Bernt has had the last 6 weeks off work, first week with a nasty flu and then he decided to take time off to get a head start on the build. That time has just ended but he has decided to take a bit more off as we’ve had to fit so many things into the last month that building work has progressed rather slowly.

First he worked super hard to get the bathroom built and ready the ger (our Mongolian tent adventure) for us to move in. We started out camping in it with just our bed and a couch; progressed to having a basic kitchen, then water, then a bathroom complete with toilet and finally a fully functioning hot water system. It really is the most glorious thing ever!! I’ve included a gallery of pics. Recently mum came for a few days and we even fitted a double bed in for her. It has so far survived 24 hours of non stop rainfall, below 0 degree nights, gale force winds and our 50 kilo puppy without any dramas.


 Bernt's super fantastic and very civilised bathroom.

So in moving into the ger we also had to move out of the blue house. We tried to do it gradually but the moving process seems determined to be difficult and stressful no matter what! It took up a lot of time and the pets seemed pretty confused by all of the to-ing and fro-ing. They always seemed more willing to jump in the car when we were heading back to the ger, they love it here. We had to really cull our stuff down to the bare minimum to fit in the ger which means that our container is looking pretty full again. But Bernt has built a great storage system in there so it wont be hard to get organised.

Then we got stuck in to laying blocks just in time for a long planned for couple of days in Melbourne for mum and I. We had a ball roaming the streets (Note; don’t decided to wear in a new pair of shoes when on holidays… dumb me!), rummaging through shops and sampling lots of yummy food (Highlight; Hwaro Korean BBQ on Little Bourke Street, don’t be scared to ask lots of questions…). As before mentioned mum also took a detour and spent 2 days with us here in Tas, to check out progress, our new living arrangements and our growing furry family.

But back home now and we are going hard on the build… weather permitting. So excited that things are moving forward at a more realistic pace now!

One rather stressful event occurred in late June when my computer died. It was a nasty slap of reality as we had been too complacent to make back ups of any of my files…. Including all of the drawings for the build, some of which (kitchen design) I hadn’t even printed off yet…. STUPID!!! Anyway, after a month of waiting for the computer fixer guy (unworthy of a more respectful title) he actually managed to save all my files and burn them to disk. Now we just need to work out how to use AutoCAD on our new Mac…

My dream basin has not yet arrived but I found a very super spectacular one in Melbourne last week if it falls through. Apparently mine has been sitting in Launceston for the last 6 weeks… Lucky I ordered it waaaay in advance.

Hope to blog much more frequently now the build is going forward more quickly.

Monday 8th June 2009

Talk about few and far between; this blog is turning into a quarterly update!. Things have been slowed significantly due to a few factors. Bernt’s 3 weeks in Holland have meant that we had to wait for 3 decent looking payslips after he got home to take to the bank to beg for more money. So that meant waiting a month after he was home and since then we have been playing one sided paperwork tennis with the banks. It’s been 2 and a half months and we’ve just managed to sign the final documents for our loan. Still have a couple of weeks to wait till things are finalised… mmmm, don’t get me started…

Bank issues aside we have been having other progress on the block. As well as our exciting side adventure which I will cover in detail in a few paragraphs J. After over a year of dealing with the local electricity supply company we finally got a power pole put in on our boundary! Yay! That was a pretty exciting day, full of trucks and fluoro vests! I watched on with worry as they decided it was easier to drag the power pole up the driveway than trying to haul it on its trailer. Surprisingly to me (not to them, they were very confidant about the whole thing) it didn’t damage the driveway even slightly.

Then, not long after the excruciating 3 weeks of Bernt being away (with a traumatised dog who kept running outside to check if ‘daddy’ was coming home or insisting on checking out the bed to see if ‘daddy’ was just having a really long sleep in) we decided to add to the family and brought home George the cat. He and Charlie were playing and sleeping together almost immediately, though George wasn’t real keen about the ‘head in Charlie’s mouth’ game… which not surprisingly turned out to be one of Charlie’s favourite new games.


Charlie asleep in a very flattering position while George sleeps on his bed. 

Bernt and I plodded along on the block, tidying up and taking off the boxing (the framework for the slab pour). Waterproofing the sides of the slab and infilling nearly up to slab height with drainage rock, things that made it look much neater for the valuer. Also laying pipe to eventually connect the drain pipes to the watertank (we learnt our lesson and had a guy come with a little excavator to dig for us).

Over Easter we decided to build a concrete ramp so we could drive up into the workshop space. We built the boxing with a cool curve in it to follow the line of the driveway. Building it took a solid 5 hours of mixing and pouring concrete in our little mixer. It was utterly exhausting but we were very happy with the finished product. Because we had chosen to sleep in a little that day Bernt ended up at the block in the dark until nearly midnight waiting for it reach that right balance between set enough but not set too much in order to smooth it to a nice finish. Luckily it dried slow enough that we could put the final touches on it the next morning. Also lucky that ramps should have a fairly rough finish… because that’s as far as our concreting skills allowed us to get… Thank god we didn’t try and finish off the slab ourselves. None the less, it is a very pretty ramp and I still insist on rave reviews from every person who has the pleasure of driving on it J


Before ramp

Finished Ramp

We also got around to finding an electrician to hook us up to electricity by installing a metre box with power point. The most super satisfying feeling to boil the kettle and have our first cup of tea on the block!! Can’t believe we’ve been here for a year with no power, or rather with only a noisy and annoying generator to get the job done. Hallelujah for electricity!!

Boiling the kettle for our first cuppa (on top of our new meter box)

I received my Kevin money, fairly early judging from facebook feedback. Thanks Kev! And with that little windfall I bought my dream basin! Well ordered it anyway, it’ll take over a month to get here. Its an Aussie company so that means I’m doing my bit doesn’t it?

So, now… let’s get back to the exciting side adventure that Bernt and I are embarking on!! About 3 weeks ago we went along to the Sustainable Building expo in Hobart, thinking we would come across some cool innovative technology… What we ended up coming across was a beautiful ger (pronounced like ‘there’). A ger is a tent which Mongolian nomadic herdsmen (apparently 30% of the Mongolian population) live in, it is otherwise known as a yurt but apparently ger is the more PC term. It was standing, fairly conspicuously, amongst solar hot water and sustainable septic system stands. We decided to go in and have a look…. and…. absolutely fell in love. It is a 6.5 metre diameter circular tent with beautifully hand painted roof poles and a sort of latticework wall structure. In the centre of the roof is a wooden circle held up by 2 posts covered by a flap which is either open or closed depending on the weather. The walls and roof are made of layers of cotton (inside and out for aesthetics), thick thick felt (which keeps the Mongolians warm at minus 40 Celsius) and canvas (which makes it water proof). It had the cosiest, womb kind of feeling inside and I didn’t want to leave. That was when we saw the ‘For Sale, 60% off’ sign…. Oh no…. Bernt and I looked at each other and all kinds of craziness ensued. 

Saatia, who’s business it represented, told us that she was in Hobart till Monday at which point she would be driving the (our) ger back to Melbourne. It was understood that we would need some instruction on how to assemble it so if we wanted it the most logical and economical thing would be for us to decide tute sweet and for her to bring it to our block and set it up for us before she drove off into the sunset on Monday. An evening of negotiations followed between Bernt and I… An intense evening full of lists, shortness of breath and near heart attacks (the latter obviously being only experienced by me… not cool hand BerntJ) We decided no, a fairly definite no at one point in the evening but then I started breathing again, picked myself up out of the foetal position and we decided, what the hell, you only live once, lets do it!!! Oh My God!!! 

So we dove in, and by Monday afternoon we had our very own little piece of Mongolia sitting in its temporary position on our slab. We are now in the process of organising all of the minute (haha) details of how we can actually functionally live in the thing! CRAZY! We wont be moving out of our rental until it has a decent bathroom (I’ve ordered a very respectable self contained composting toilet) and we have worked through all of the other logistical issues. But I’m very very excited and have been playing around with super essential things like fairly lights J I hope you all want to come and visit when it is set up! Ill post photos of the interior when its liveable to alleviate any concerns! OH MY GOD! What a crazy adventure!

Friday 15th May 2009

Our crazy new side adventure; to live in a mongolian tent for a while.


The bones of the ger being set up on the slab (temporarily).


Bernt putting up a pole.


The set up team in front of the finished product.


I couldnt resist these beautiful orange lanterns. Pretty!

Thursday 22nd Jan 2009

Slab Poured!

Well a few weeks turned into a few months. We had a lot of pre slab organising to do and a few visitors thrown into the mix so sit tight and Ill try and fill you in without rambling too muchJ

In preparation for laying the slab we had to employ our first outside contractor for the under-slab plumbing. Bernt and I measured where all of the drains needed to go and slowly dug the trenches. It was really tough work digging in the hard clay, especially when we had to dig through the area where we had previously mixed concrete. Didn’t realise the impact washing down the cement mixer would have on the soil below. It had set rock hard to a depth of 20cm or so. This wasn’t to be the end of our digging spree. We also had to dig a 30m trench along the south side of the shed, I say ‘we’ very roughly. Bernt did the lion’s share of the digging, he is a machine!  In that trench we laid pipe to eventually connect the down pipes to a water tank as well as an agricultural drain to stop water from flowing down the slope and under the slab.

The Plumber and his assistant came in on the 28th Oct and worked very efficiently, laying all of the under-slab pipes in 2 hours. We next took delivery of all of the in-slab infrastructure; steel mesh, reinforcing rods etc etc as well as the 150 polystyrene ‘pods’ which the slab would be poured over and around. These pods are about a metre square and 225mm thick and as they are made of such a lightweight material we had to build a huge cage from the steel mesh to house them until we were to lay them, lest they blew away. So Bernt and I built a cage. Such a silly undertaking, we could have killed ourselves. The sheets of mesh are 6m by 2.4m and so heavy that we could barely lift them with just the two of us. None the less we needed to build this cage and only had the one evening to do it before the pods arrived. The sides were fairly straight forward but lifting 2 sheets for the roof and holding them above our heads while they were tied in place nearly killed us both. Copious swearing that evening!

 

 The cage we built to house the polystyrene pods.

We had a few things to do to finish off the retaining wall, namely waterproofing it to stop rising damp from entering the slab. Most probably over the top, our engineer had specified that we both paint it with a bituminous tanking layer as well as lining it with a plastic sheeting. Not hard jobs. Then we installed another agricultural drain to remove any moisture build-up that may happen underslab and backfilled with fine crushed rock (more digging). We then lined the front of the retaining wall with more polystyrene in the form of sheets with a rendered side. These form a part of our uber-insualtion plan but we also used the over hang at the top to form part of the ‘boxing’ which would hold in the concrete for the eventual slab pour. We then had piles and piles of fine crushed rock delivered to spread out under the slab. This was in early November and was where we stopped for a while, only really getting back into the swing of things after Christmas.

In the mean time we had lots of exciting non build related things happening! My mum and Craig came to stay for a couple of weeks, we got ourselves a gorgeous little puppy (now a bit of a terror toddler), Bernt’s brother Felix and his friend Rosalba stayed for a week, at the same time Millie (who I used to baby-sit a millennia ago) and her boyfriend Jeremy came for a weekend. And so we had lots of catching up and a bit of sightseeing to do with all. We did have our water tank delivered during this time. Most beautiful water tank you’ve ever seen! It’s the colour that our roof will eventually be. 98000Litre capacity which makes all of the locals who see it laugh because they’ve never seen anything that big and are sceptical that we’ll ever fill it. One even called it a reservoir! We also had a go at putting the first coat of render onto the retaining wall (over the insulation). It wasn’t a complete success, I think it dried a bit too quickly but it was good to have a practice in a spot which will be hidden by veranda. We have had heaps of tips about how to improve for next time.

Over this break in proceedings our piles of fine crushed rock sat unattended on our shed site, slowly hardening in the rain and sunshine until they developed a thick crust impenetrable by our shovels. So we enlisted the help of our neighbour and his trusty tractor to help flatten the piles for us. He came just after Christmas and we spent Bernt’s 2 week Christmas break hard at work preparing for the slab. More digging, again Bernt doing most of the hard physical work. We worked on getting the fine crushed rock exactly level, then hired a ‘whaka packa’ to… well… whacka packa it (compact). That was my job, done in parts while Bernt levelled the next bit. Next we had to roll out 250 square metres of a geotextile fabric, slowly, adding sand on top as we went otherwise it blew away. These jobs were often made more difficult by a playful puppy who decided that a huge roll of fabric was heaps of fun to chase and bite at. It felt a lot like we were making some kind of huge quilt.

 

The neighbour helping us level the fine crushed rock. 

Boxing came next. Our slab is a floating one, with no footings so we had to build an edge all of the way around into which the concrete would be poured. We had ordered some timber straight from the mill a couple of months earlier for the purpose. The slab was to be 325mm high (allowing a 100mm cover over the waffle pods). So we spent a few days tripping over stringlines, making triangular bracings and fighting off a biting dog. But it was a spectacular thing to see at the end, the exact footprint of the shed for the first time, we could walk around in it, and of course the boxing was beautifully straight and level (except for some bits at the end when my laser level started going wonky and begged to be recalibrated.)

At about this point Bernt decided to go home to Holland to help his dad move house (and pack up all of his stuff that was still there) so we had a bit of a mad rush to get everything organised in order to pour the slab before he left. We had been convinced that we shouldn’t do the concreting ourselves so I got a few quotes with very varying results. We ended up going with a guy suggested to us by the guy who was removing the timber from the cleared block next door to us. I was really happy with the guy we chose, he sounded very professional and his price was really really good! I ordered 40 cubic metres of concrete and organised a concrete boom pump (a truck with a huge crane-like arm which pipes the concrete out of the concrete truck and moves around the slab to pour it where it is needed). It was all a bit short notice, I gave them just less than two weeks notice, but I managed to organise everything we needed.

Then I had to organise a council inspection. We poured on the Tuesday but the latest the inspector could come out was the Friday before so we had a mad rush to get as much of the infrastructure in as possible for him to inspect. Levelling the sand took some work (more digging) then we had to roll out a layer of plastic (to stop water getting in the slab). The plastic had to be taped together at every join (and every hole). This was tricky around the plumbing pipes, especially as it was a warm day so the duct tape would stretch out then contract later, buckling all of the plastic. Fiddly! Then polystyrene pods, trench mesh (the steel around the edges), then reinforcing bars running between every single polystyrene pod (they have a 100mm gap between them), then spacers on top of each pod on which sits the 6m x 2.4m steel mesh. The mesh was hard, it of course was really heavy and we had to carry it over the pods to put it in place and THEN we had to break down the cage we had earlier built to house the pods. SO that was a big job, 21 sheets of it but we managed to do it just the two of us (bit more swearing involved). Yay for us! All of the steel had to be tied together and we still had a few gaps to fill with mesh.

Around this time Bernt’s mum Froukje arrived for a short, we were still in a panic to finish all of the last minute fiddly bits before the council inspector came. She gave us a hand in those last few days which was a huge help. Froukje and I tied in all of the starter bars (the bars which stick out of the slab to tie in the block walls to be built) as well as finishing off placing the ‘bar chairs’ (spacers to lift the mesh up off the pods). We also tied in the perimeter bar which was an extra thick reinforcing rod for the edge of the slab. There were so many things to ‘tie’ together, I thank god for this special tool we bought which you just hook into the looped end of the wire ties and pull on, it then twists the wire tie without you having to do any wrist movement at all. One company who quoted on our slab materials had just quoted us a spool of wire to do all the tying, we would have had to twist hundreds and hundreds of the damn things by hand…. Crazy!

While Froukje and I did the fiddly bits, Bernt dug two holes for two posts which will sit outside the slab. Poor Bernt, I hope there’s no digging for him to do in Holland, he needs a break from the shovel and wheelbarrow. He also bent all of the starter bars for us. I needn’t have stressed about not being finished before the council inspection, he was very relaxed; just really measured to make sure we were using the right thickness steel. Very easy!

So the last few days comprised of late nights working till the sun went down (9pmish), scrounging around to feed ourselves without the time for a properly prepared meal and an increasing excitement for the pour day. And then it was the night before the big day…. Felt like Christmas Eve for me. I was so excited and nervous that we had done everything properly.

And then the BIG DAY arrived!!!! We got up early early, made our way to the block with cameras charged and at the ready! The concreters arrived at 6:30, relaxed and confident (thank god someone was J). Then the boom pump arrived at 6:45, then… the first load of concrete at 7! Literally, THE MOST EXCITING DAY OF MY LIFE! I think the blokes all thought I was a bit odd; I may have done a few little dances, and yes… perhaps there were a few muted squeals of excitement… so sue meJ.

And then they poured and poured and they smoothed and smoothed and concrete truck after concrete truck arrived and left until the last of the 8 concrete trucks emptied his last drop of concrete. And the concreters were so so good, they just knew what they were doing, one even sung a little bit ‘lovin you is easy coz you’re beautiful’  (He never did try that high bit..). I felt exactly the same about the concrete (perhaps HE wasn’t singing about the concrete though). And the best bit was that after 2 weeks of working our pants off, we could sit, relax and watch someone complete the job to perfection! And it was perfection! They went over the floor in the workshop (because it will remain concrete without any covering) again and again with the helicopter trowel (a machine that has blades that spin around and around to finish off the surface.. much like an upside-down helicopter… perhaps that’s why they call it… nah never mind…J). They went over it so many times that it shone like a mirror by the end of the day. It is a beautiful finish; we had no idea how good it would turn out! They finished by about 3 in the afternoon and Bernt and I had our first walk on it. Barefoot. Just beautiful! And so exciting! I wish you all could come and have a walk on it!

So now we have something solid that we can call our own! It’s all up from here, literally. Next the timber frame and the walls and roof, but I’m getting ahead of myself… Now there will probably be another huge gap until my next update because Bernt is in Holland for 3 weeks then we have to go to the bank for some more money. Until next time…